RTA logo Projects in the 2017-2021 Capital Program for All Service Boards

This page provides a list of all the projects in the 2017-2021 capital program and their programmed budget for the current year and out years. The charts show the current year funding by service board and mode, and the distribution of funding, as a percentage, by asset category for all service boards. Column heading key:

Totals By Service Board and Mode
Totals By Program Category
*Other includes Miscellaneous, Acquisitions & Extensions, and Contingencies & Administration.

Click on a column header to sort the table by that column.

Project # Service Board Mode Asset Category Title TIP ID Current Year Funding (2017) Future Years Funding (2018-2021)
021.806 CTA Bus Rolling Stock Perform Mid-Life Bus Overhaul and Upgrade Activities 16-00-0004 $14,987,164 $60,102,097
021.803 CTA Bus Rolling Stock Perform Bus Overhaul and Upgrade Activities 16-12-0009 $2,500,000 $10,000,000
0285 CTA Bus Rolling Stock Renew Incline - 63rd Street Yard 16-12-0009 $182,400 $0
031.054 CTA Bus Rolling Stock Purchase a Minimum of 75 Articulated Buses (Option II) ( Partial $) -- Systemwide 16-14-0001 $8,200,000 $0
031.054 CTA Bus Rolling Stock Purchase a Minimum of 75 Articulated Buses (Option II) ( Partial $) -- Systemwide 16-96-0061 $14,454,413 $57,365,128
121.500 CTA Rail Electrical, Signal, & Communications Replace/Upgrade Power Distribution and Signals -- Systemwide 16-00-0030 $19,666,417 $17,000,000
181.500 CTA Rail Miscellaneous Renew Right-of-Way and Footwalk -- State Street Subway and Ravenswood Line $5,825,396 $0
304.004 CTA Rail Rail Improvements Rehabilitate North Mainline -- Red Line 16-10-9001 $939,749,481 $812,249,193
195.027 CTA Rail Rail Improvements Rehabilitate Blue Line ? O?Hare Branch/Your New Blue (YNB) 16-14-0007 $30,408,830 $39,874,308
0908 CTA Rail Rail Improvements Provide for Contingencies $2,920,328 $2,975,814
254.001 CTA Rail Rail Improvements Extend Red Line South (EIS) -- Red Line $6,688,281 $0
022.903 CTA Rail Rolling Stock Perform Rail Car Overhaul and Upgrade Activities 16-00-0006 $15,730,288 $94,196,051
0286 CTA Rail Rolling Stock Provide for Contingencies 16-00-0006 $193,129 $0
022.906 CTA Rail Rolling Stock Perform "C" Overhaul Rail Car Activities 16-00-0010 $2,500,000 $10,000,000
0287 CTA Rail Rolling Stock Perform Rail Car Maintenance Activities 16-12-0010 $1,300,000 $0
132.056 CTA Rail Rolling Stock Replace 144 Rail Cars (2200's) 16-15-0006 $38,219,801 $176,737,173
022.903 CTA Rail Rolling Stock Perform Rail Car Overhaul and Upgrade Activities $1,000,000 $0
0788 CTA Rail Rolling Stock Purchase Heavy Service Vehicles - Utility $2,000,000 $0
0812 CTA Rail Rolling Stock Provide for Engineering Technical Assistance $1,626,835 $0
0861 CTA Rail Rolling Stock Provide for Supporting Services $1,354,713 $0
141.273 CTA Rail Stations & Passenger Facilities Reconstruct a Minimum of 5 Rail Stations (Partial $) -- Howard/ Red Line, O'Hare/ Blue Line and Evanston/ Purple Line 16-02-0004 $53,274,782 $12,865,877
141.273 CTA Rail Stations & Passenger Facilities Reconstruct a Minimum of 5 Rail Stations (Partial $) -- Howard/ Red Line, O'Hare/ Blue Line and Evanston/ Purple Line 16-03-0004 $7,351,272 $2,000,000
141.273 CTA Rail Stations & Passenger Facilities Reconstruct a Minimum of 5 Rail Stations (Partial $) -- Howard/ Red Line, O'Hare/ Blue Line and Evanston/ Purple Line $2,000,000 $0
086.500 CTA Rail Support Facilities & Equipment Purchase Equipment and Non-Revenue Vehicles -- Systemwide 16-13-0003 $7,924,753 $7,100,000
073.500 CTA Rail Support Facilities & Equipment Improve Facilities for Transit Enhancements -- Systemwide 16-99-0002 $10,000,000 $50,000,000
181.500 CTA Rail Track & Structure Renew Right-of-Way and Footwalk -- State Street Subway and Ravenswood Line 16-98-0015 $15,140,027 $61,944,903
254.001 CTA Rail Track & Structure Extend Red Line South (EIS) -- Red Line $4,981,548 $0
306.001 CTA System Contingencies & Administration Provide for Program Management -- Systemwide 16-01-0008 $6,090,000 $26,760,000
150.028 CTA System Electrical, Signal, & Communications Implement Security Projects -- Systemwide 16-03-0011 $6,591,730 $26,000,000
0294 CTA System Electrical, Signal, & Communications Capital Maintenance - Bus $150,000 $0
401.500 CTA System Electrical, Signal, & Communications CTA Control Center Safety Enhancements $1,347,875 $0
0290 CTA System Miscellaneous P/I End User Computing Systems 16-13-0003 $7,736,494 $0
0297 CTA System Miscellaneous P/I Replacement of Unisys Mainframe 16-13-0003 $2,743,743 $0
0298 CTA System Miscellaneous P/I Relational Database Mgmt System 16-13-0003 $1,823,974 $0
404.500 CTA System Miscellaneous Implement CMAQ Projects 16-13-0005 $0 $8,890,857
0292 CTA System Miscellaneous Install Office Systems $150,000 $0
0293 CTA System Miscellaneous P/I Administrative Equipment-Graphics $250,000 $0
404.500 CTA System Miscellaneous Implement CMAQ Projects $0 $12,922,000
102.500 CTA System Stations & Passenger Facilities Ventra Mobile Application Enhancements - Divvy Bike Share (102.043) $500,000 $0
086.500 CTA System Support Facilities & Equipment Purchase Equipment and Non-Revenue Vehicles -- Systemwide 16-13-0003 $1,874,999 $16,875,000
061.059 CTA System Support Facilities & Equipment Implement Computer Systems -- Systemwide 16-98-0003 $1,807,386 $8,964,291
0288 CTA System Support Facilities & Equipment Perform Rail Car Maintenance Activities 16-99-0002 $1,600,000 $0
073.500 CTA System Support Facilities & Equipment Improve Facilities for Transit Enhancements -- Systemwide 16-99-0002 $20,009,229 $59,722,015
5095 Metra Rail Contingencies & Administration Metra Capital Funding $2,400,000 $9,600,000
5189 Metra Rail Contingencies & Administration Infrastructure Engineering $270,000 $0
5190 Metra Rail Contingencies & Administration Infrastructure Engineering $1,850,000 $12,400,000
5191 Metra Rail Contingencies & Administration Infrastructure Engineering $1,850,000 $2,000,000
5192 Metra Rail Contingencies & Administration Infrastructure Engineering $1,850,000 $3,700,000
5193 Metra Rail Contingencies & Administration Infrastructure Engineering $1,850,000 $2,000,000
5194 Metra Rail Contingencies & Administration Infrastructure Engineering $1,600,000 $2,000,000
5195 Metra Rail Contingencies & Administration Engineering Asset Management $1,000,000 $2,000,000
5197 Metra Rail Contingencies & Administration Locally Funded Projects/Match $0 $9,270,000
5198 Metra Rail Contingencies & Administration Project Administration $900,000 $4,000,000
5199 Metra Rail Contingencies & Administration Contingencies $1,422,252 $9,650,864
F-ICE Metra Rail Contingencies & Administration RTA ICE Funded Projects - TBD $0 $10,499,000
4343 Metra Rail Electrical, Signal, & Communications Positive Train Control (PTC) 18-10-0034 $55,772,242 $30,000,000
2539 Metra Rail Electrical, Signal, & Communications (2) Install BI-direction Signaling - 11th Pl-67th St-MED $0 $9,000,000
4254 Metra Rail Electrical, Signal, & Communications Traction Power System Augment $10,000,000 $0
4742 Metra Rail Electrical, Signal, & Communications Stray Current Protection $0 $500,000
4744 Metra Rail Electrical, Signal, & Communications Protective Relay Replacement $0 $1,200,000
4746 Metra Rail Electrical, Signal, & Communications Impedance Bonds $300,000 $1,200,000
4842 Metra Rail Electrical, Signal, & Communications 16th Street Interlocker $9,397,437 $9,000,000
5050 Metra Rail Electrical, Signal, & Communications Rectifier Replacement $0 $1,200,000
5145 Metra Rail Electrical, Signal, & Communications Signal System Upgrades $500,000 $0
5146 Metra Rail Electrical, Signal, & Communications Signal System Upgrades $500,000 $0
5147 Metra Rail Electrical, Signal, & Communications Signal System Upgrades $500,000 $0
5148 Metra Rail Electrical, Signal, & Communications Signal System Improvements $0 $3,000,000
5149 Metra Rail Electrical, Signal, & Communications Lake Street Interlocker $1,500,000 $8,000,000
5150 Metra Rail Electrical, Signal, & Communications Milwaukee District North (MWD-N) J-Line Rehabilitation $0 $800,000
5151 Metra Rail Electrical, Signal, & Communications Fiber Optic Cable $6,000,000 $3,000,000
5152 Metra Rail Electrical, Signal, & Communications Fiber Optic Cable $570,000 $3,500,000
5153 Metra Rail Electrical, Signal, & Communications Fiber Optic Cable $400,000 $3,000,000
5154 Metra Rail Electrical, Signal, & Communications Radio Dispatching System $1,000,000 $0
5196 Metra Rail Miscellaneous Unanticipated Capital $2,500,000 $7,268,000
4904 Metra Rail Rolling Stock Rehabilitate Locomotives - Midlife 18-06-9112 $30,000,000 $0
4906 Metra Rail Rolling Stock Rehabilitate Metra Cars 18-10-0006 $26,428,075 $0
4507 Metra Rail Rolling Stock Locomotive Rehabilitation $0 $16,920,000
4510 Metra Rail Rolling Stock Rehab of Up To 41 Bi-Level Commuter Cars $0 $0
4909 Metra Rail Rolling Stock Rail Car Rehabilitation (Nippon Sharyo-1) $5,625,000 $0
4911 Metra Rail Rolling Stock Purchase New Gallery Cars $0 $70,100,000
5006 Metra Rail Rolling Stock Purchase New Gallery Cars $25,000,000 $82,105,000
5007 Metra Rail Rolling Stock Rail Car Rehabilitation (Nippon Sharyo-2) $16,125,000 $31,106,000
5008 Metra Rail Rolling Stock MU Car Improvements $0 $2,159,274
5009 Metra Rail Rolling Stock Rail Car Rehabilitation (Nippon Sharyo Highliners) $0 $49,500,000
5010 Metra Rail Rolling Stock Replacement of Car and Locomotive Cameras $4,500,000 $12,000,000
5011 Metra Rail Rolling Stock Rehabilitate Locomotive $8,000,000 $0
5101 Metra Rail Rolling Stock Overhaul Traction Motors $1,700,000 $7,364,714
5102 Metra Rail Rolling Stock Commuter Car and Locomotive Improvements $2,000,000 $6,000,000
5103 Metra Rail Rolling Stock Wheel Replacement $3,000,000 $14,000,000
5105 Metra Rail Rolling Stock Locomotive Rehabilitation $5,000,000 $0
5106 Metra Rail Rolling Stock Vehicle Inspection System $1,000,000 $0
5109 Metra Rail Rolling Stock Purchase Locomotives $41,420,000 $0
AB024 Metra Rail Rolling Stock Locomotive Mid-Life Rehabilitation $0 $97,239,000
AE-102 Metra Rail Rolling Stock Rail Car Rehabilitation (Nippon Sharyo-3) $0 $15,335,000
AE-103 Metra Rail Rolling Stock Rail Car Rehabilitation (Nippon Sharyo-4) $0 $77,625,000
AP-026 Metra Rail Rolling Stock Locomotive Rebuild (100-149, 215, 216) $0 $20,000,000
4784 Metra Rail Stations & Passenger Facilities Van Buren Station $7,000,000 $8,000,000
4983 Metra Rail Stations & Passenger Facilities Homewood Station $4,000,000 $2,000,000
5077 Metra Rail Stations & Passenger Facilities Station Signs $0 $750,000
5175 Metra Rail Stations & Passenger Facilities ADA Improvements $3,000,000 $12,000,000
5176 Metra Rail Stations & Passenger Facilities Luminous Platform Signs $550,000 $0
5177 Metra Rail Stations & Passenger Facilities System Station Improvements $1,000,000 $33,000,000
5179 Metra Rail Stations & Passenger Facilities Station Facility Improvements $1,500,000 $6,550,000
5180 Metra Rail Stations & Passenger Facilities Design Engineering of 147th Street Station $300,000 $0
4368 Metra Rail Support Facilities & Equipment Revenue Accounting $1,930,000 $0
4852 Metra Rail Support Facilities & Equipment Financial System Replacement $1,822,931 $15,000,000
4972 Metra Rail Support Facilities & Equipment Yard Improvements $20,000,000 $12,000,000
5060 Metra Rail Support Facilities & Equipment CCF Fire Protection $800,000 $0
5139 Metra Rail Support Facilities & Equipment Bridge Improvements $0 $500,000
5155 Metra Rail Support Facilities & Equipment Yard Improvements $500,000 $4,956,000
5156 Metra Rail Support Facilities & Equipment Yard Improvements $1,000,000 $4,000,000
5157 Metra Rail Support Facilities & Equipment Yard Improvements $1,000,000 $5,500,000
5158 Metra Rail Support Facilities & Equipment Yard Improvements $1,000,000 $3,000,000
5159 Metra Rail Support Facilities & Equipment Yard Improvements $4,000,000 $2,000,000
5160 Metra Rail Support Facilities & Equipment Yard Improvements $1,000,000 $6,500,000
5161 Metra Rail Support Facilities & Equipment Right of Way Equipment $1,000,000 $4,000,000
5162 Metra Rail Support Facilities & Equipment Equipment and Vehicle Mechanics $1,000,000 $5,500,000
5163 Metra Rail Support Facilities & Equipment Police Vehicles $500,000 $2,000,000
5164 Metra Rail Support Facilities & Equipment Office Equipment $200,000 $1,100,000
5165 Metra Rail Support Facilities & Equipment IT Components & Services $1,900,000 $8,100,000
5167 Metra Rail Support Facilities & Equipment 547 Building System Improvements $200,000 $1,000,000
5169 Metra Rail Support Facilities & Equipment Storage Equipment $600,000 $0
5171 Metra Rail Support Facilities & Equipment GPS/Train Tracking $2,000,000 $4,000,000
2112 Metra Rail Track & Structure Replace Bridges -- UP-North Line (Partial $) $23,000,000 $16,000,000
4816 Metra Rail Track & Structure Row Retaining Wall and Embankments $0 $2,750,000
4833 Metra Rail Track & Structure Deering Bridge $0 $19,000,000
4840 Metra Rail Track & Structure North Line Bridges (Phased) $0 $15,000,000
5032 Metra Rail Track & Structure Right of Way Fencing $0 $400,000
5048 Metra Rail Track & Structure Right of Way Fencing $0 $300,000
5111 Metra Rail Track & Structure Ties, Ballast, & SW Heaters $3,000,000 $6,250,000
5112 Metra Rail Track & Structure Ties and Ballast $2,500,000 $3,000,000
5113 Metra Rail Track & Structure Ties and Ballast $1,000,000 $4,000,000
5114 Metra Rail Track & Structure Ties and Ballast $0 $5,500,000
5115 Metra Rail Track & Structure Ties and Ballast $1,500,000 $7,000,000
5117 Metra Rail Track & Structure Rail Grinding $200,000 $1,800,000
5118 Metra Rail Track & Structure Rail Grinding $0 $360,000
5120 Metra Rail Track & Structure NCS Improvements $820,000 $4,322,000
5122 Metra Rail Track & Structure Undercutting & Surfacing $200,000 $0
5123 Metra Rail Track & Structure Undercutting & Surfacing $300,000 $0
5124 Metra Rail Track & Structure Undercutting & Surfacing $500,000 $2,000,000
5125 Metra Rail Track & Structure Undercutting & Surfacing $300,000 $1,250,000
5126 Metra Rail Track & Structure Undercutting & Surfacing $200,000 $2,750,000
5127 Metra Rail Track & Structure Rail Replacement $1,000,000 $1,000,000
5128 Metra Rail Track & Structure Rail Replacement $500,000 $0
5129 Metra Rail Track & Structure Rail (Intrack Welding - 50/50) $1,000,000 $1,000,000
5130 Metra Rail Track & Structure Rail Replacement $1,000,000 $1,000,000
5131 Metra Rail Track & Structure Rail Replacement $500,000 $9,000,000
5132 Metra Rail Track & Structure Rail Replacement $1,000,000 $3,000,000
5133 Metra Rail Track & Structure J-Line Siding $1,500,000 $0
5134 Metra Rail Track & Structure Crossings (Road & Track) $1,000,000 $1,000,000
5135 Metra Rail Track & Structure Crossings (Road & Track) $1,000,000 $2,000,000
5136 Metra Rail Track & Structure Crossings (Road & Track - 50/50) $1,200,000 $2,375,000
5137 Metra Rail Track & Structure Crossings (Road & Track) $500,000 $6,000,000
5138 Metra Rail Track & Structure Bridges and Retaining Walls $1,832,000 $4,100,000
5139 Metra Rail Track & Structure Bridge Improvements $250,000 $3,000,000
5140 Metra Rail Track & Structure Bridge Improvements $400,000 $1,900,000
5141 Metra Rail Track & Structure Bridge Improvements $250,000 $0
5142 Metra Rail Track & Structure Bridge Improvements $500,000 $1,000,000
5143 Metra Rail Track & Structure Crossings (Road & Track) $1,000,000 $3,000,000
5144 Metra Rail Track & Structure Catenary Structure Rehabilitation $1,000,000 $3,200,000
BL-101 Metra Rail Track & Structure Plant Welds $0 $1,600,000
5109 Pace Bus Electrical, Signal, & Communications Purchase/Install Intelligent Bus System (IBS) and Mobile Data Terminals (MDT) -- Systemwide $1,660,000 $3,500,000
5223 Pace Bus Miscellaneous Provide for Unanticipated Capital -- Systemwide $250,000 $1,000,000
5200 Pace Bus Rolling Stock Purchase Small Fixed Route Buses $2,043,000 $0
5201 Pace Bus Rolling Stock Purchase Fixed Route Buses $33,960,944 $73,799,800
5202 Pace Bus Rolling Stock Purchase Paratransit Vehicles $6,718,928 $26,194,898
5203 Pace Bus Rolling Stock Purchase Community/Call-n-Ride vehicles $1,564,745 $6,450,000
5204 Pace Bus Rolling Stock Purchase Vanpool Vans $0 $18,120,000
5205 Pace Bus Rolling Stock Replace/Retrofit Engines/Transmissions $900,000 $6,999,902
T-0001 Pace Bus Rolling Stock Purchase 40" Fixed Route Buses $27,000,000 $0
5118 Pace Bus Stations & Passenger Facilities Plainfield Park-n-Ride Lot 17-08-0039 $4,800,000 $0
4828 Pace Bus Stations & Passenger Facilities Provide Consultant for Bus Stop Conversion -- Systemwide $0 $2,700,000
5219 Pace Bus Stations & Passenger Facilities Passenger Facilities Mid Life Renovation $0 $8,600,000
5220 Pace Bus Stations & Passenger Facilities Install Shelters/ Signs/ Passenger Amenities -- Systemwide $500,000 $4,250,000
5221 Pace Bus Stations & Passenger Facilities Purchase/install/construct bus stop shelters, concrete pads, cross walks, pedestrian signals, etc., $1,240,000 $0
5211 Pace Bus Support Facilities & Equipment Improve Garages & Facilities -- Systemwide $2,045,000 $28,851,781
5212 Pace Bus Support Facilities & Equipment Purchase Computer Hardware and Software Systems -- Systemwide $3,400,000 $4,100,000
5213 Pace Bus Support Facilities & Equipment Purchase Maintenance/ Support Equipment and Vehicles -- Systemwide $669,740 $3,500,000
5214 Pace Bus Support Facilities & Equipment Purchase Replacement Farebox System -- Systemwide $0 $3,500,000
5215 Pace Bus Support Facilities & Equipment Construct Bus Garage -- Northwest Cook County $0 $9,000,000
5216 Pace Bus Support Facilities & Equipment Purchase Office Equipment -- Systemwide $0 $2,000,000
5217 Pace Bus Support Facilities & Equipment Purchase software, hardware and services for the Oracle Technology Refresh Project $5,000,000 $0
T-0002 Pace Bus Support Facilities & Equipment Purchase Satellite Garage (I-55) $23,000,000 $0
T-0003 Pace Bus Support Facilities & Equipment Purchase Satellite Garage (I-90) $28,100,000 $0
9999 RTA System Miscellaneous Provide for Improvements at 19 Priority Transit Transfer Location -- Systemwide 16-94-0006 $500,000 $0
Total $1,786,692,582 $2,703,665,940
Source: RTA Capital Program Database