RTA logo Community Planning

The Community Planning program provides funding and planning assistance to applicants for implementation and planning projects that benefit the community and the regional transit system. Eligible implementation projects include zoning code updates, developer discussion panels, pedestrian access improvement plans and other innovative implementation approaches. Eligible planning projects include transit-oriented development (TOD) plans, and corridor, subregional or local access improvement plans.

Municipalities, counties, townships, councils of government / municipal associations, groups of two or more municipalities, and the RTA Service Boards (Chicago Transit Authority, Metra and Pace) located within the RTA's six-county service region (Cook, DuPage, Kane, Lake, McHenry and Will Counties) are eligible to apply to the Community Planning Program.

Through this program, the RTA seeks projects that are consistent with Regional Transit Strategic Plan. For more information, visit the program website at Community Planning program website.

To view the TOD study locations on a map, see the TOD Viewer.

RTA Community Planning Program Implementation Report.

community planning community planning community planning community planning community planning

Projects By Status
Funding Totals by Source
StatusNumber of Projects
Completed176
In Progress10
Programmed1
Total187
Funding Source Total Percent
RTA$9,461,661 46.8%
Local$4,586,096 22.7%
Federal$6,170,056 30.5%
Total$20,217,813100%

Click on a column header to sort the table by that column.

Year Project Title Project Type Grantee Funding Source Status
RTA Local Federal Total
2016 CTA Bus Corridor Slow Zone Improvement Initiatives Transit Improvement Plan CTA $254,876.00 $63,719.00 $0.00 $318,595.00 In Progress
2016 Chicago - Jefferson Station Area Master Plan Transit-Oriented Development Plan City of Chicago $20,000.00 $25,000.00 $80,000.00 $125,000.00 In Progress
2016 Des Plaines TOD Developer Discussion Panel Developer Panel City of Des Plaines $3,000.00 $0.00 $0.00 $3,000.00 Completed
2016 DuPage Last Mile Transit Planning Study Transit Improvement Plan DuPage County Division of Transportation $0.00 $0.00 $0.00 $0.00 In Progress
2016 Morton Grove Developer Discussion Panel Developer Panel Village of Morton Grove $3,000.00 $0.00 $0.00 $3,000.00 Completed
2016 Morton Grove TOD Zoning Update TOD Zoning Update Village of Morton Grove $25,000.00 $0.00 $0.00 $25,000.00 In Progress
2016 Olympia Fields TOD Zoning Update TOD Zoning Update Village of Olympia Fields $25,000.00 $0.00 $0.00 $25,000.00 In Progress
2016 Pace North Harlem Avenue Corridor Study Transit Improvement Plan Pace $0.00 $40,000.00 $160,000.00 $200,000.00 Programmed
2015 Aurora Pedestrian Access to Transit Improvement Plan Pedestrian Access to Transit City of Aurora $0.00 $0.00 $0.00 $0.00 Completed
2015 Aurora Station Boulevard Transit Plan Update Transit Improvement Plan City of Aurora $0.00 $0.00 $0.00 $0.00 In Progress
2015 Bartlett Downtown / TOD Plan Transit-Oriented Development Plan Village of Bartlett $0.00 $24,984.92 $99,939.67 $124,924.59 Completed
2015 Brookfield TOD Zoning Update TOD Zoning Update Village of Brookfield $4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015 Evanston TOD Parking Regulations Update TOD Zoning Update City of Evanston $5,000.00 $0.00 $20,000.00 $25,000.00 In Progress
2015 Forest Park TOD Zoning Code Update (Roosevelt & Harlem) TOD Zoning Update Village of Forest Park $4,000.00 $0.00 $16,000.00 $20,000.00 In Progress
2015 Highwood TOD Zoning Update TOD Zoning Update City of Highwood $4,000.00 $0.00 $16,000.00 $20,000.00 In Progress
2015 Libertyville TOD Plan Transit-Oriented Development Plan Village of Libertyville $80,000.00 $20,000.00 $0.00 $100,000.00 In Progress
2015 Mount Prospect Rand Road Corridor Plan Transit Improvement Plan Village of Mount Prospect $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2015 Pace Local Transit Planning For Hoffman Estates, Waukegan and Woodridge Transit Improvement Plan Pace Suburban Bus $0.00 $30,000.00 $120,000.00 $150,000.00 Completed
2015 Pace North Avenue Corridor Study Transit Improvement Plan Pace Suburban Bus $0.00 $40,000.00 $160,000.00 $200,000.00 Completed
2015 Palatine TOD Plan Transit-Oriented Development Plan Village of Palatine $79,994.00 $19,999.00 $0.00 $99,993.00 Completed
2015 River Grove Developer Discussion Panel Developer Panel Village of River Grove $3,000.00 $0.00 $0.00 $3,000.00 Completed
2015 Skokie Developer Discussion Panel Developer Panel Village of Skokie $3,000.00 $0.00 $0.00 $3,000.00 Completed
2015 West Chicago Developer Discussion Panel Developer Panel City of West Chicago $3,000.00 $0.00 $0.00 $3,000.00 Completed
2015 Worth TOD Plan Transit-Oriented Development Plan Village of Worth $19,954.67 $14,966.00 $39,909.33 $74,830.00 Completed
2014 Bellwood Developer Discussion Panel Developer Panel Village of Bellwood $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Forest Park Developer Discussion Panel Developer Panel Village of Forest Park $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Fox Lake Developer Discussion Panel Developer Panel Village of Fox Lake $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Geneva TOD Zoning Update TOD Zoning Update City of Geneva $4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2014 Kane County Ride-in-Kane Assessment Transit Improvement Plan Kane County DOT $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2014 Lemont Developer Discussion Panel Developer Panel Village of Lemont $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Melrose Park Broadway Avenue Corridor Plan Transit Improvement Plan Village of Melrose Park $0.00 $19,999.60 $79,998.40 $99,998.00 Completed
2014 Park Forest TOD Pedestrian Access Plan Pedestrian Access to Transit Village of Park Forest $0.00 $0.00 $0.00 $0.00 Completed
2014 Tinley Park Developer / Financial Advisory Panel Developer Panel Village of Tinley Park $3,000.00 $0.00 $0.00 $3,000.00 Completed
2013 Blue Island Developer Discussion Panel Developer Panel City of Blue Island $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 City of Chicago Ashland-Western Bus Rapid Transit Land Use Development Plan Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013 City of Chicago Metra Station Area Typology Study Transit-Oriented Development Plan City of Chicago $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2013 Franklin Park Zoning Code Update TOD Zoning Update Village of Franklin Park $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013 Hanover Park Developer Discussion Panel Developer Panel Village of Hanover Park $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Highwood Transit-Oriented Development Plan Transit-Oriented Development Plan City of Highwood $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2013 New Lenox Developer Discussion Panel Developer Panel Village of New Lenox $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Northbrook TOD Zoning Code Update TOD Zoning Update Village of Northbrook $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013 Oak Forest Developer Discussion Panel Developer Panel City of Oak Forest $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Pace Fox Valley Study Transit Improvement Plan Pace $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2013 Park Forest Developer Discussion Panel Developer Panel Village of Park Forest $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Richton Park Developer Discussion Panel Developer Panel Village of Richton Park $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Ridgeland Avenue Corridor Study Transit-Oriented Development Plan and Transit Improvement Plan Cook County Department of Transportation and Highways $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013 River Grove Thatcher Avenue TOD Transit-Oriented Development Plan Village of River Grove $60,000.00 $15,000.00 $0.00 $75,000.00 Completed
2013 University Park Developer Discussion Panel Developer Panel Village of University Park $3,500.00 $0.00 $0.00 $3,500.00 Completed
2013 Villa Park Developer Discussion Panel Developer Panel Village of Villa Park $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Winthrop Harbor TOD Zoning Code Update TOD Zoning Update Village of Winthrop Harbor $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012 Bensenville Developer Discussion Panel Developer Panel Village of Bensenville $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Buffalo Grove TOD Zoning Code Update TOD Zoning Update Village of Buffalo Grove $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012 Cicero Connections Initiative Transit-Oriented Development Plan and Transit Improvement Plan Town of Cicero $118,503.20 $29,625.80 $0.00 $148,129.00 Completed
2012 Evanston Main Street Station Transit-Oriented Development Plan Transit-Oriented Development Plan City of Evanston $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2012 Fox Lake Station Area Plan Transit-Oriented Development Plan Village of Fox Lake $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2012 Franklin Park Developer Discussion Panel Developer Panel Village of Franklin Park $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Kenilworth Corridor Transportation and Streetscape Plan Transit Improvement Plan Village of Kenilworth $59,999.20 $14,999.80 $0.00 $74,999.00 Completed
2012 La Grange Stone Avenue Station Access Improvement Plan Pedestrian Access to Transit Village of LaGrange $0.00 $0.00 $0.00 $0.00 Completed
2012 Lake Villa Downtown TOD Plan Transit-Oriented Development Plan Village of Lake Villa $99,872.00 $24,968.00 $0.00 $124,840.00 Completed
2012 Manhattan Developer Discussion Panel Developer Panel Village of Manhattan $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Maywood Developer Discussion Panel Developer Panel Village of Maywood $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Midlothian Developer Discussion Panel Developer Panel Village of Midlothian $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Mokena Developer Discussion Panel Developer Panel Village of Mokena $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Mount Prospect Downtown Implementation Plan Transit-Oriented Development Plan Village of Mount Prospect $78,876.00 $19,719.00 $0.00 $98,595.00 Completed
2012 Robbins Pedestrian Access Improvement Plan Pedestrian Access to Transit Village of Robbins $11,856.60 $0.00 $47,426.40 $59,283.00 Completed
2012 Villa Park TOD Zoning Code Update TOD Zoning Update Village of Villa Park $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012 Village of Carpentersville Transit Improvement Plan Transit Improvement Plan Village of Carpentersville $59,983.20 $14,995.80 $0.00 $74,979.00 Completed
2012 Westmont TOD Zoning Code Update TOD Zoning Update Village of Westmont $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012 Wilmette TOD Zoning Code Update (Parking) TOD Zoning Update Village of Wilmette $2,000.00 $0.00 $8,000.00 $10,000.00 Completed
2012 Wood Dale Developer Discussion Panel Developer Panel Village of Wood Dale $3,500.00 $0.00 $0.00 $3,500.00 Completed
2011 Blue Island TOD Zoning Code Update TOD Zoning Update City of Blue Island $21,666.00 $0.00 $0.00 $21,666.00 Completed
2011 Chicago Southland TOD Corridor Planning Study Phase II Implementation Transit-Oriented Development Plan South Suburban Mayors and Managers Association (SSMMA) $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2011 Cicero Avenue Corridor Plan Transit-Oriented Development Plan and Transit Improvement Plan Southwest Conference of Mayors $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2011 Elgin Chicago Street Station Area Plan Transit-Oriented Development Plan City of Elgin $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2011 Hanover Park Village Center Transit-Oriented Development (TOD) Transit-Oriented Development Plan Village of Hanover Park $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2011 Hoffman Estates Flexible Transit Service Operations Transit Improvement Plan Village of Hoffman Estates $64,000.00 $16,000.00 $0.00 $80,000.00 Completed
2011 Manhattan TOD Zoning Code Update TOD Zoning Update Village of Manhattan $21,666.00 $0.00 $0.00 $21,666.00 Completed
2011 McHenry County Services Restructuring Study Transit Improvement Plan McHenry County $119,996.80 $29,999.20 $0.00 $149,996.00 Completed
2011 Naperville Metra Station Bus Depot and Commuter Access Feasibility Study Transit Improvement Plan City of Naperville $63,327.20 $15,831.80 $0.00 $79,159.00 Completed
2011 Northbrook Downtown Station Area Plan Transit-Oriented Development Plan Village of Northbrook $99,604.00 $24,901.00 $0.00 $124,505.00 Completed
2011 Prairie Grove TOD Zoning Code Update TOD Zoning Update Village of Prairie Grove $21,666.00 $0.00 $0.00 $21,666.00 Completed
2011 Rolling Meadows Golf Road Transit and Pedestrian Mobility Study Transit Improvement Plan City of Rolling Meadows $71,008.00 $17,752.00 $0.00 $88,760.00 Completed
2011 Romeoville East Side Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Romeoville $79,960.00 $19,990.00 $0.00 $99,950.00 Completed
2010 Chicago South Lakefront Corridor Transit Study Transit Improvement Plan City of Chicago $359,956.00 $89,989.00 $0.00 $449,945.00 Completed
2010 Chicago Washington Park 63rd Street Corridor TOD Study Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $119,983.32 $29,995.83 $0.00 $149,979.15 Completed
2010 Clarendon Hills Train Station Redevelopment Phase I Implementation Transit-Oriented Development Plan Village of Clarendon Hills $79,984.00 $19,996.00 $0.00 $99,980.00 Completed
2010 Geneva Downtown / Station Area Master Plan Transit-Oriented Development Plan City of Geneva $99,265.13 $24,816.28 $0.00 $124,081.41 Completed
2010 Hanover Park - County Farm Road Transit Service Study Transit Improvement Plan Village of Hanover Park $120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2010 Lombard Downtown Implementation Study Transit-Oriented Development Plan Village of Lombard $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2010 Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid Transit Transit Improvement Plan Pace $94,641.60 $23,660.40 $0.00 $118,302.00 Completed
2010 Skokie-Dempster Station Area Plan Transit-Oriented Development Plan Village of Skokie $99,768.20 $24,942.05 $0.00 $124,710.25 Completed
2010 South Elgin Transit Improvement Plan Transit Improvement Plan Village of South Elgin $60,000.00 $15,000.00 $0.00 $75,000.00 Completed
2009 Antioch Downtown Land Use and Transit Implementation Strategy Transit-Oriented Development Plan Village of Antioch $79,766.00 $19,942.00 $0.00 $99,708.00 Completed
2009 Bensenville Transit Improvement Plan and Station Area Study Transit-Oriented Development Plan and Transit Improvement Plan Village of Bensenville $98,504.00 $24,626.00 $0.00 $123,130.00 Completed
2009 Chicago - Metra Milwaukee District West Line Transit-Friendly Development Plan Transit-Oriented Development Plan City of Chicago $175,698.00 $43,924.00 $0.00 $219,622.00 Completed
2009 Chicago Southland Transit Region Transit-Oriented Development Plan South Suburban Mayors and Managers Association $140,000.00 $35,000.00 $0.00 $175,000.00 Completed
2009 Des Plaines Cumberland Transit-Oriented Development Plan Transit-Oriented Development Plan City of Des Plaines $83,550.34 $0.00 $41,151.66 $124,702.00 Completed
2009 DuPage County Transit Plan Update Transit Improvement Plan DuPage County $50,000.00 $68,532.82 $0.00 $118,532.82 Completed
2009 East Dundee: Dundee Crossing Transit Center Transit-Oriented Development Plan and Transit Improvement Plan Village of East Dundee $79,816.00 $19,954.00 $0.00 $99,770.00 Completed
2009 Glenwood Station Area Study Transit-Oriented Development Plan Village of Glenwood $73,400.00 $18,350.00 $0.00 $91,750.00 Completed
2009 Harlem Avenue Corridor Transit-Oriented Development Plan and Transit Improvement Plan Southwest Conference of Mayors $157,723.89 $39,430.97 $0.00 $197,154.86 Completed
2009 Joliet Intermodal Transportation Center Feasibility Study Transit Improvement Plan City of Joliet $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2009 Kane County LRP Transit Component Transit Improvement Plan Kane County $80,000.00 $39,738.00 $0.00 $119,738.00 Completed
2009 Manhattan Village Center Transit-Oriented Development Plan Village of Manhattan $100,000.00 $25,018.00 $0.00 $125,018.00 Completed
2009 Pace I-355 Express Bus Transit Improvement Plan Pace $212,787.20 $53,196.80 $0.00 $265,984.00 Completed
2009 Prairie Grove Town Center and TOD Development Plan Transit-Oriented Development Plan Village of Prairie Grove $94,734.00 $23,684.00 $0.00 $118,418.00 Completed
2009 Schaumburg Transit Service Assessment Transit Improvement Plan Village of Schaumburg $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2009 Southwest Will TMA Study Transit Improvement Plan Joliet Arsenal Development Authority $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2009 St. Charles Circulator Feasibility Study Transit Improvement Plan City of St. Charles $79,428.00 $19,857.00 $0.00 $99,285.00 Completed
2009 Western Springs Downtown Plan Transit-Oriented Development Plan Village of Western Springs $95,984.00 $23,996.00 $0.00 $119,980.00 Completed
2009 Will County Coordinated Paratransit Study Transit Improvement Plan Will County $79,996.00 $19,999.00 $0.00 $99,995.00 Completed
2009 Wilmette Village Center Master Plan Transit-Oriented Development Plan Village of Wilmette $99,302.40 $24,825.60 $0.00 $124,128.00 Completed
2007 Addison Advantage Transit Improvements Transit Improvement Plan Village of Addison $0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2007 Chicago Heights Station Area Plan Transit-Oriented Development Plan City of Chicago Heights $0.00 $19,915.00 $79,660.00 $99,575.00 Completed
2007 Chicago Transit-Friendly Development at CTA Stations Transit-Oriented Development Plan City of Chicago $200,000.00 $50,000.00 $0.00 $250,000.00 Completed
2007 Evanston Multi-Modal Master Transportation Plan Transit Improvement Plan City of Evanston $0.00 $80,000.00 $20,000.00 $100,000.00 Completed
2007 Greater Roseland (Chicago) Transit-Linked Community Development Project Transit Improvement Plan Developing Communities Project (DCP) $30,000.00 $0.00 $120,000.00 $150,000.00 Completed
2007 Huntley Transit-Oriented Development Guidelines Transit-Oriented Development Plan Village of Huntley $0.00 $21,103.00 $84,410.00 $105,513.00 Completed
2007 Kane County Randall Road Pace Route 529 Plan Transit-Oriented Development Plan and Transit Improvement Plan Kane County $0.00 $25,000.00 $100,000.00 $125,000.00 Completed
2007 Lake County Inter/Intra County Paratransit Transportation Study Transit Improvement Plan Lake County $0.00 $19,322.00 $77,289.00 $96,611.00 Completed
2007 Lake Forest: Forest Green Transit Study Transit Improvement Plan City of Lake Forest $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2007 Marengo Station Area Plan Transit-Oriented Development Plan City of Marengo $0.00 $19,948.00 $79,792.00 $99,740.00 Completed
2007 Mount Prospect Public Transportation System Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Mount Prospect $0.00 $24,959.00 $99,836.00 $124,795.00 Completed
2007 Plainfield STAR Line Transit-Oriented Development District Plan Transit-Oriented Development Plan Village of Plainfield $0.00 $24,625.00 $98,498.00 $123,123.00 Completed
2007 South Chicago Heights Station Area Plan Transit-Oriented Development Plan Village of South Chicago Heights $0.00 $19,931.00 $79,724.00 $99,655.00 Completed
2006 Berwyn Transit-Oriented Master Plan Transit-Oriented Development Plan City of Berwyn $19,078.00 $0.00 $76,313.00 $95,391.00 Completed
2006 Chicago--Reconnecting Neighborhoods Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $51,243.00 $53,446.00 $118,757.00 $223,446.00 Completed
2006 Crete Downtown and Balmoral Park Station Area Plans Transit-Oriented Development Plan Village of Crete $2,770.00 $20,000.00 $91,080.00 $113,850.00 Completed
2006 Elgin National Street Station Area Plan Transit-Oriented Development Plan City of Elgin $0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2006 Montgomery Park and Ride Facility Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Montgomery $80,000.00 $32,496.00 $0.00 $112,496.00 Completed
2006 Pace Service Planning Tool Transit Improvement Plan Pace $250,000.00 $802,570.00 $0.00 $1,052,570.00 Completed
2006 South Suburban Commuter Rail Corridor Phase I & II Transit Improvement Plan South Suburban Mayors and Managers Association $76,811.00 $241,300.00 $0.00 $318,111.00 Completed
2006 Winfield Town Center Revitalization Plan Transit-Oriented Development Plan Village of Winfield $938.00 $20,000.00 $83,750.00 $104,688.00 Completed
2005 Bellwood Transit Oriented-Development Plan Transit-Oriented Development Plan Village of Bellwood $0.00 $20,771.00 $83,084.00 $103,855.00 Completed
2005 Buffalo Grove Transit-Oriented Development Plan Transit-Oriented Development Plan Village of Buffalo Grove $12,443.00 $12,443.00 $99,541.00 $124,427.00 Completed
2005 Elmwood Park Station Area Plan Transit-Oriented Development Plan Village of Elmwood Park $0.00 $19,023.00 $76,094.00 $95,117.00 Completed
2005 Justice Transit Improvement Study Transit Improvement Plan Village of Justice $6,741.00 $6,741.00 $53,928.00 $67,410.00 Completed
2005 Melrose Park Lake Street Transit Improvement Plan Transit Improvement Plan Village of Melrose Park $0.00 $15,770.00 $63,080.00 $78,850.00 Completed
2005 Mokena Transit-Oriented Development Plan Transit-Oriented Development Plan Village of Mokena $4,900.00 $20,000.00 $99,600.00 $124,500.00 Completed
2005 Naperville Circulator Implementation Plan Transit Improvement Plan City of Naperville $65,634.00 $16,409.00 $0.00 $82,043.00 Completed
2005 Orland Park LaGrange Road Transit Improvement Plan Transit Improvement Plan Village of Orland Park $0.00 $19,971.00 $79,884.00 $99,855.00 Completed
2005 Villa Park Station Area Plan Transit-Oriented Development Plan Village of Villa Park $0.00 $15,577.00 $62,310.00 $77,887.00 Completed
2004 DuPage Phase I Community Circulators Transit Improvement Plan DuPage Mayors & Managers $140,151.00 $30,000.00 $0.00 $170,151.00 Completed
2004 Harvey Intermodal Station Area Plan Transit-Oriented Development Plan City of Harvey $16,739.00 $0.00 $66,954.00 $83,693.00 Completed
2004 Midlothian Station Area Enhancement Transit-Oriented Development Plan Village of Midlothian $60,000.00 $0.00 $80,000.00 $140,000.00 Completed
2004 Niles Bus Oriented-Development Plan for Milwaukee Avenue Transit-Oriented Development Plan and Transit Improvement Plan Village of Niles $10,000.00 $10,000.00 $80,000.00 $100,000.00 Completed
2004 Park Forest Metra Electric District 211th Street Station Area Plan Transit-Oriented Development Plan Village of Park Forest $10,200.00 $9,800.00 $80,000.00 $100,000.00 Completed
2004 Skokie and Evanston: Skokie Swift Corridor Travel Market Analysis Transit Improvement Plan Evanston/Skokie $120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2004 Wood Dale Station Area Plan Transit-Oriented Development Plan Village of Wood Dale $0.00 $18,340.00 $73,360.00 $91,700.00 Completed
2003 Cook-DuPage Corridor Study Transit Improvement Plan RTA $1,039,789.00 $0.00 $578,211.00 $1,618,000.00 Completed
2003 La Grange Comprehensive Plan Update and BNSF Corridor Plan Transit-Oriented Development Plan Village of LaGrange $0.00 $65,000.00 $60,000.00 $125,000.00 Completed
2003 Mundelein Station Area Plan Transit-Oriented Development Plan Village of Mundelein $0.00 $18,568.00 $60,000.00 $78,568.00 Completed
2003 New Lenox Station Area Plan Transit-Oriented Development Plan Village of New Lenox $0.00 $24,326.00 $97,303.00 $121,629.00 Completed
2003 Oak Park Intermodal Station Area Plan Transit-Oriented Development Plan Village of Oak Park $0.00 $181,518.00 $60,000.00 $241,518.00 Completed
2003 Pace Market Feasibility Study for North Central Shuttle Service Transit Improvement Plan Pace $15,083.00 $0.00 $60,334.00 $75,417.00 Completed
2003 Riverside Central Business District Station Area Plan Transit-Oriented Development Plan Village of Riverside $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2003 Winthrop Harbor Station Area Plan Transit-Oriented Development Plan Village of Winthrop Harbor $0.00 $14,440.00 $57,760.00 $72,200.00 Completed
2002 Franklin Park West Line Station Area Planning Study Transit-Oriented Development Plan Village of Franklin Park $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2002 Lemont Station Area Planning Study Transit-Oriented Development Plan Village of Lemont $0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2002 North Chicago Station Area Planning Study Transit-Oriented Development Plan City of North Chicago $0.00 $14,964.00 $59,856.00 $74,820.00 Completed
2002 Richton Park Station Area Planning Study Transit-Oriented Development Plan Village of Richton Park $10,042.00 $7,500.00 $70,168.00 $87,710.00 Completed
2002 Wheeling Station Area Planning Study Transit-Oriented Development Plan Village of Wheeling $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2001 Fox River Grove Downtown Redevelopment Plan Transit-Oriented Development Plan Village of Fox River Grove $0.00 $14,500.00 $58,000.00 $72,500.00 Completed
2001 Lake County 2020 Transportation Plan: Transit Component Transit Improvement Plan Lake County $0.00 $0.00 $0.00 $0.00 Completed
2001 Maywood Station Area Planning Study Transit-Oriented Development Plan Village of Maywood $17,620.00 $0.00 $70,748.00 $88,368.00 Completed
2001 Woodstock Transit-Oriented Development Study Transit-Oriented Development Plan City of Woodstock $0.00 $13,500.00 $54,000.00 $67,500.00 Completed
2000 Hazel Crest 170th Street Station Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of Hazel Crest $11,000.00 $0.00 $44,000.00 $55,000.00 Completed
2000 Inner and Outer Circumferential Rail Corridors Feasibility Study Transit Improvement Plan Metra $30,755.00 $51,464.00 $106,502.00 $188,721.00 Completed
2000 Joliet Arsenal Area Transportation Plan Transit Improvement Plan Joliet Arsenal Development Authority $20,000.00 $90,000.00 $80,000.00 $190,000.00 Completed
2000 McHenry County Transportation Plan: Transit Component Transit Improvement Plan McHenry County $0.00 $0.00 $0.00 $0.00 Completed
2000 Morton Grove Commuter Station Location Analysis Transit-Oriented Development Plan Village of Morton Grove $50,000.00 $49,500.00 $0.00 $99,500.00 Completed
2000 Riverdale 138th Street Station Planning Study Transit-Oriented Development Plan Village of Riverdale $9,700.00 $0.00 $38,800.00 $48,500.00 Completed
2000 Robbins Metra Station Transit-Oriented Development Study Transit-Oriented Development Plan Village of Robbins $11,400.00 $0.00 $45,600.00 $57,000.00 Completed
2000 Skokie Swift Station Location Feasibility Study Transit Improvement Plan Village of Skokie $39,912.00 $39,971.00 $80,000.00 $159,883.00 Completed
2000 University Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of University Park $0.00 $14,987.00 $59,946.00 $74,933.00 Completed
1999 Blue Island Transit-Oriented Development Transit-Oriented Development Plan City of Blue Island $22,200.00 $0.00 $0.00 $22,200.00 Completed
1999 DuPage Area Transit Plan Transit Improvement Plan DuPage Mayors and Managers Conference $150,778.00 $0.00 $126,467.00 $277,245.00 Completed
1999 Elmhurst Downtown Plan Transit-Oriented Development Plan City of Elmhurst $7,500.00 $0.00 $0.00 $7,500.00 Completed
1999 Evanston Transportation Center Planning Study Transit-Oriented Development Plan City of Evanston $69,447.00 $29,763.00 $0.00 $99,210.00 Completed
1999 Kane County Transit Opportunity Assessment Transit Improvement Plan Kane County $0.00 $16,736.00 $27,000.00 $43,736.00 Completed
1999 Lake County Route 60 and Route 22 Corridor Shuttle Study Transit Improvement Plan TMA of Lake Cook $45,000.00 $0.00 $0.00 $45,000.00 Completed
1999 Olympia Fields Town Center Development Plan Transit-Oriented Development Plan Village of Olympia Fields $37,949.00 $0.00 $0.00 $37,949.00 Completed
1999 Orland Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of Orland Park $30,000.00 $20,000.00 $0.00 $50,000.00 Completed
1999 Waukegan Intermodal Transit Facility Study Transit-Oriented Development Plan City of Waukegan $15,000.00 $40,000.00 $60,000.00 $115,000.00 Completed
1999 Westmont Transit-Oriented Development Opportunity Study Transit-Oriented Development Plan Village of Westmont $20,000.00 $0.00 $20,000.00 $40,000.00 Completed
1998 Northwest Corridor Study Transit Improvement Plan Northwest Municipal Conference $346,487.00 $298,974.00 $484,000.00 $1,129,461.00 Completed
1998 Tinley Park Station Area Plans Transit-Oriented Development Plan Village of Tinley Park $40,000.00 $0.00 $0.00 $40,000.00 Completed