Community Planning

The Community Planning program provides funding and planning assistance to communities at the local level for planning projects that benefit both the local communities and the RTA transit system. Launched in 1999 under the name Regional Technical Assistance Program (RTAP), the program was renamed and launched as Community Planning in 2008 to better reflect the program's focus on planning assistance for local communities.

Community Planning offers units of local government such as municipalities, townships, and local planning agencies an opportunity to participate in the planning of local transit and transit related opportunities. Services offered include the creation of station area / transit-oriented development plans, transit-oriented development guidelines, local transit improvement plans for bus and rail, and coordinated paratransit plans.

Through this program, the RTA seeks projects that are consistent with the four primary goals of its strategic plan: provide transportation options, ensure financial viability, enhance livability and economic vitality, and demonstrate value. For more information, visit the program website at www.rtams.org/cp.

To view the TOD study locations on a map, Click Here.

Click on a column header to sort the table by that column.

YearProject Title Project TypeGrantee Funding SourceStatus
RTALocalFederal Total
2013 City of Chicago Metra Station Area Typology Study Transit-Oriented Development Plan City of Chicago $100,000 $25,000 $0 $125,000 Programmed
2013 City of Chicago Western-Ashland Bus Rapid Transit Land Use Development Plan Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $160,000 $40,000 $0 $200,000 Programmed
2013 Highwood Transit-Oriented Development Plan Transit-Oriented Development Plan City of Highwood $100,000 $25,000 $0 $125,000 Programmed
2013 Pace Transit Analysis and Planning Transit Improvement Plan Pace $80,000 $20,000 $0 $100,000 Programmed
2013 Ridgeland Avenue Corridor Study Transit-Oriented Development Plan and Transit Improvement Plan Cook County Highway Department $160,000 $40,000 $0 $200,000 Programmed
2013 River Grove Thatcher Avenue TOD Transit-Oriented Development Plan Village of River Grove $60,000 $15,000 $0 $75,000 Programmed
2012 Cicero Connections Initiative Transit-Oriented Development Plan and Transit Improvement Plan Town of Cicero $118,503 $29,626 $0 $148,129 Programmed
2012 Evanston Main Street Station Transit-Oriented Development Plan Transit-Oriented Development Plan City of Evanston $100,000 $25,000 $0 $125,000 Programmed
2012 Fox Lake Station Area Plan Transit-Oriented Development Plan Village of Fox Lake $80,000 $20,000 $0 $100,000 In Progress
2012 Kenilworth Corridor Transportation and Streetscape Plan Transit Improvement Plan Village of Kenilworth $59,999 $15,000 $0 $74,999 In Progress
2012 Lake Villa Downtown TOD Plan Transit-Oriented Development Plan Village of Lake Villa $99,872 $24,968 $0 $124,840 In Progress
2012 Mount Prospect Downtown Implementation Plan Transit-Oriented Development Plan Village of Mount Prospect $78,876 $19,719 $0 $98,595 In Progress
2012 Village of Carpentersville Transit Improvement Plan Transit Improvement Plan Village of Carpentersville $59,983 $14,996 $0 $74,979 In Progress
2011 Chicago Southland TOD Corridor Planning Study Phase II Implementation Transit-Oriented Development Plan South Suburban Mayors and Managers Association (SSMMA) $100,000 $25,000 $0 $125,000 Completed
2011 Cicero Avenue Corridor Plan Transit-Oriented Development Plan and Transit Improvement Plan Southwest Conference of Mayors $160,000 $40,000 $0 $200,000 In Progress
2011 Elgin Chicago Street Station Area Plan Transit-Oriented Development Plan City of Elgin $80,000 $20,000 $0 $100,000 In Progress
2011 Hanover Park Village Center Transit-Oriented Development (TOD) Transit-Oriented Development Plan Village of Hanover Park $80,000 $20,000 $0 $100,000 Completed
2011 Hoffman Estates Flexible Transit Service Operations Transit Improvement Plan Village of Hoffman Estates $64,000 $16,000 $0 $80,000 In Progress
2011 McHenry County Services Restructuring Study Transit Improvement Plan McHenry County $119,997 $29,999 $0 $149,996 In Progress
2011 Naperville Metra Station Bus Depot and Commuter Access Feasibility Study Transit Improvement Plan City of Naperville $63,327 $15,832 $0 $79,159 Completed
2011 Northbrook Downtown Station Area Plan Transit-Oriented Development Plan Village of Northbrook $99,604 $24,901 $0 $124,505 Completed
2011 Rolling Meadows Golf Road Transit and Pedestrian Mobility Study Transit Improvement Plan City of Rolling Meadows $71,008 $17,752 $0 $88,760 In Progress
2011 Romeoville East Side Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Romeoville $79,960 $19,990 $0 $99,950 Completed
2010 Chicago South Lakefront Corridor Transit Study Transit Improvement Plan City of Chicago $359,956 $89,989 $0 $449,945 Completed
2010 Chicago Washington Park 63rd Street Corridor TOD Study Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $119,983 $29,996 $0 $149,979 In Progress
2010 Clarendon Hills Train Station Redevelopment Phase I Implementation Transit-Oriented Development Plan Village of Clarendon Hills $79,984 $19,996 $0 $99,980 Completed
2010 Geneva Downtown / Station Area Master Plan Transit-Oriented Development Plan City of Geneva $99,265 $24,816 $0 $124,081 Completed
2010 Hanover Park - County Farm Road Transit Service Study Transit Improvement Plan Village of Hanover Park $120,000 $30,000 $0 $150,000 Completed
2010 Lombard Downtown Implementation Study Transit-Oriented Development Plan Village of Lombard $100,000 $25,000 $0 $125,000 Completed
2010 Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid Transit Transit Improvement Plan Pace $94,642 $23,660 $0 $118,302 Completed
2010 Skokie-Dempster Station Area Plan Transit-Oriented Development Plan Village of Skokie $99,768 $24,942 $0 $124,710 In Progress
2010 South Elgin Transit Improvement Plan Transit Improvement Plan Village of South Elgin $60,000 $15,000 $0 $75,000 Completed
2009 Antioch Downtown Land Use and Transit Implementation Strategy Transit-Oriented Development Plan Village of Antioch $79,766 $19,942 $0 $99,708 Completed
2009 Bensenville Transit Improvement Plan and Station Area Study Transit-Oriented Development Plan and Transit Improvement Plan Village of Bensenville $98,504 $24,626 $0 $123,130 Completed
2009 Chicago Southland Transit Region Transit-Oriented Development Plan South Suburban Mayors and Managers Association $140,000 $35,000 $0 $175,000 Completed
2009 Des Plaines Cumberland Transit-Oriented Development Plan Transit-Oriented Development Plan City of Des Plaines $83,550 $0 $41,152 $124,702 Completed
2009 DuPage County Transit Plan Update Transit Improvement Plan DuPage County $50,000 $68,533 $0 $118,533 Completed
2009 East Dundee: Dundee Crossing Transit Center Transit-Oriented Development Plan and Transit Improvement Plan Village of East Dundee $79,816 $19,954 $0 $99,770 Completed
2009 Glenwood Station Area Study Transit-Oriented Development Plan Village of Glenwood $73,400 $18,350 $0 $91,750 Completed
2009 Harlem Avenue Corridor Transit-Oriented Development Plan and Transit Improvement Plan Southwest Conference of Mayors $157,724 $39,431 $0 $197,155 Completed
2009 Joliet Intermodal Transportation Center Feasibility Study Transit Improvement Plan City of Joliet $100,000 $25,000 $0 $125,000 Completed
2009 Kane County LRP Transit Component Transit Improvement Plan Kane County $80,000 $39,738 $0 $119,738 Completed
2009 Manhattan Village Center Transit-Oriented Development Plan Village of Manhattan $100,000 $25,018 $0 $125,018 Completed
2009 Metra Milwaukee District West Line Transit-Friendly Development Plan Transit-Oriented Development Plan City of Chicago $175,698 $43,924 $0 $219,622 Completed
2009 Pace I-355 Express Bus Transit Improvement Plan Pace $212,787 $53,197 $0 $265,984 Completed
2009 Prairie Grove Town Center and TOD Development Plan Transit-Oriented Development Plan Village of Prairie Grove $94,734 $23,684 $0 $118,418 Completed
2009 Schaumburg Transit Service Assessment Transit Improvement Plan Village of Schaumburg $80,000 $20,000 $0 $100,000 Completed
2009 Southwest Will TMA Study Transit Improvement Plan Joliet Arsenal Development Authority $100,000 $25,000 $0 $125,000 Completed
2009 St. Charles Circulator Feasibility Study Transit Improvement Plan City of St. Charles $79,428 $19,857 $0 $99,285 Completed
2009 Western Springs Downtown Plan Transit-Oriented Development Plan Village of Western Springs $95,984 $23,996 $0 $119,980 Completed
2009 Will County Coordinated Paratransit Study Transit Improvement Plan Will County $79,996 $19,999 $0 $99,995 Completed
2009 Wilmette Village Center Master Plan Transit-Oriented Development Plan Village of Wilmette $99,302 $24,826 $0 $124,128 Completed
2007 Addison Advantage Transit Improvements Transit Improvement Plan Village of Addison $0 $20,000 $80,000 $100,000 Completed
2007 Chicago Heights Station Area Plan Transit-Oriented Development Plan City of Chicago Heights $0 $19,915 $79,660 $99,575 Completed
2007 Chicago Transit-Friendly Development at CTA Stations Transit-Oriented Development Plan City of Chicago $200,000 $50,000 $0 $250,000 Completed
2007 Evanston Multi-Modal Master Transportation Plan Transit Improvement Plan City of Evanston $0 $80,000 $20,000 $100,000 Completed
2007 Greater Roseland (Chicago) Transit-Linked Community Development Project Transit Improvement Plan Developing Communities Project (DCP) $30,000 $0 $120,000 $150,000 Completed
2007 Huntley Transit-Oriented Development Guidelines Transit-Oriented Development Plan Village of Huntley $0 $21,103 $84,410 $105,513 Completed
2007 Kane County Randall Road Pace Route 529 Plan Transit-Oriented Development Plan and Transit Improvement Plan Kane County $0 $25,000 $100,000 $125,000 Completed
2007 Lake County Inter/Intra County Paratransit Transportation Study Transit Improvement Plan Lake County $0 $19,322 $77,289 $96,611 Completed
2007 Lake Forest: Forest Green Transit Study Transit Improvement Plan City of Lake Forest $80,000 $20,000 $0 $100,000 Completed
2007 Marengo Station Area Plan Transit-Oriented Development Plan City of Marengo $0 $19,948 $79,792 $99,740 Completed
2007 Mount Prospect Public Transportation System Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Mount Prospect $0 $24,959 $99,836 $124,795 Completed
2007 Plainfield STAR Line Transit-Oriented Development District Plan Transit-Oriented Development Plan Village of Plainfield $0 $24,625 $98,498 $123,123 Completed
2007 South Chicago Heights Station Area Plan Transit-Oriented Development Plan Village of South Chicago Heights $0 $19,931 $79,724 $99,655 Completed
2006 Berwyn Transit-Oriented Master Plan Transit-Oriented Development Plan City of Berwyn $19,078 $0 $76,313 $95,391 Completed
2006 Chicago--Reconnecting Neighborhoods Transit-Oriented Development Plan and Transit Improvement Plan City of Chicago $51,243 $53,446 $118,757 $223,446 Completed
2006 Crete Downtown and Balmoral Park Station Area Plans Transit-Oriented Development Plan Village of Crete $2,770 $20,000 $91,080 $113,850 Completed
2006 Elgin National Street Station Area Plan Transit-Oriented Development Plan City of Elgin $0 $20,000 $80,000 $100,000 Completed
2006 Montgomery Park and Ride Facility Plan Transit-Oriented Development Plan and Transit Improvement Plan Village of Montgomery $80,000 $32,496 $0 $112,496 Completed
2006 Pace Service Planning Tool Transit Improvement Plan Pace $250,000 $802,570 $0 $1,052,570 Completed
2006 South Suburban Commuter Rail Corridor Phase I & II Transit Improvement Plan South Suburban Mayors and Managers Association $76,811 $241,300 $0 $318,111 Completed
2006 Winfield Town Center Revitalization Plan Transit-Oriented Development Plan Village of Winfield $938 $20,000 $83,750 $104,688 Completed
2005 Bellwood Transit Oriented-Development Plan Transit-Oriented Development Plan Village of Bellwood $0 $20,771 $83,084 $103,855 Completed
2005 Buffalo Grove Transit-Oriented Development Plan Transit-Oriented Development Plan Village of Buffalo Grove $12,443 $12,443 $99,541 $124,427 Completed
2005 Elmwood Park Station Area Plan Transit-Oriented Development Plan Village of Elmwood Park $0 $19,023 $76,094 $95,117 Completed
2005 Justice Transit Improvement Study Transit Improvement Plan Village of Justice $6,741 $6,741 $53,928 $67,410 Completed
2005 Melrose Park Lake Street Transit Improvement Plan Transit Improvement Plan Village of Melrose Park $0 $15,770 $63,080 $78,850 Completed
2005 Mokena Transit-Oriented Development Plan Transit-Oriented Development Plan Village of Mokena $4,900 $20,000 $99,600 $124,500 Completed
2005 Naperville Circulator Implementation Plan Transit Improvement Plan City of Naperville $65,634 $16,409 $0 $82,043 Completed
2005 Orland Park LaGrange Road Transit Improvement Plan Transit Improvement Plan Village of Orland Park $0 $19,971 $79,884 $99,855 Completed
2005 Villa Park Station Area Plan Transit-Oriented Development Plan Village of Villa Park $0 $15,577 $62,310 $77,887 Completed
2004 Harvey Intermodal Station Area Plan Transit-Oriented Development Plan City of Harvey $16,739 $0 $66,954 $83,693 Completed
2004 Midlothian Station Area Enhancement Transit-Oriented Development Plan Village of Midlothian $60,000 $0 $80,000 $140,000 Completed
2004 Niles Bus Oriented-Development Plan for Milwaukee Avenue Transit-Oriented Development Plan and Transit Improvement Plan Village of Niles $10,000 $10,000 $80,000 $100,000 Completed
2004 Park Forest Metra Electric District 211th Street Station Area Plan Transit-Oriented Development Plan Village of Park Forest $10,200 $9,800 $80,000 $100,000 Completed
2004 Skokie and Evanston: Skokie Swift Corridor Travel Market Analysis Transit Improvement Plan Evanston/Skokie $120,000 $30,000 $0 $150,000 Completed
2004 Wood Dale Station Area Plan Transit-Oriented Development Plan Village of Wood Dale $0 $18,340 $73,360 $91,700 Completed
2003 Cook-DuPage Corridor Study Transit Improvement Plan RTA $1,039,789 $0 $578,211 $1,618,000 Completed
2003 La Grange Comprehensive Plan Update and BNSF Corridor Plan Transit-Oriented Development Plan Village of LaGrange $0 $65,000 $60,000 $125,000 Completed
2003 Mundelein Station Area Plan Transit-Oriented Development Plan Village of Mundelein $0 $18,568 $60,000 $78,568 Completed
2003 New Lenox Station Area Plan Transit-Oriented Development Plan Village of New Lenox $0 $24,326 $97,303 $121,629 Completed
2003 Oak Park Intermodal Station Area Plan Transit-Oriented Development Plan Village of Oak Park $0 $181,518 $60,000 $241,518 Completed
2003 Pace Market Feasibility Study for North Central Shuttle Service Transit Improvement Plan Pace $15,083 $0 $60,334 $75,417 Completed
2003 Riverside Central Business District Station Area Plan Transit-Oriented Development Plan Village of Riverside $0 $15,000 $60,000 $75,000 Completed
2003 Winthrop Harbor Station Area Plan Transit-Oriented Development Plan Village of Winthrop Harbor $0 $14,440 $57,760 $72,200 Completed
2002 Franklin Park West Line Station Area Planning Study Transit-Oriented Development Plan Village of Franklin Park $0 $15,000 $60,000 $75,000 Completed
2002 Lemont Station Area Planning Study Transit-Oriented Development Plan Village of Lemont $0 $20,000 $80,000 $100,000 Completed
2002 North Chicago Station Area Planning Study Transit-Oriented Development Plan City of North Chicago $0 $14,964 $59,856 $74,820 Completed
2002 Richton Park Station Area Planning Study Transit-Oriented Development Plan Village of Richton Park $10,042 $7,500 $70,168 $87,710 Completed
2002 Wheeling Station Area Planning Study Transit-Oriented Development Plan Village of Wheeling $0 $15,000 $60,000 $75,000 Completed
2001 Fox River Grove Downtown Redevelopment Plan Transit-Oriented Development Plan Village of Fox River Grove $0 $14,500 $58,000 $72,500 Completed
2001 Lake County 2020 Transportation Plan: Transit Component Transit Improvement Plan Lake County $0 $0 $0 $0 Completed
2001 Maywood Station Area Planning Study Transit-Oriented Development Plan Village of Maywood $17,620 $0 $70,748 $88,368 Completed
2001 Woodstock Transit-Oriented Development Study Transit-Oriented Development Plan City of Woodstock $0 $13,500 $54,000 $67,500 Completed
2000 Hazel Crest 170th Street Station Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of Hazel Crest $11,000 $0 $44,000 $55,000 Completed
2000 Inner and Outer Circumferential Rail Corridors Feasibility Study Transit Improvement Plan Metra $30,755 $51,464 $106,502 $188,721 Completed
2000 Joliet Arsenal Area Transportation Plan Transit Improvement Plan Joliet Arsenal Development Authority $20,000 $90,000 $80,000 $190,000 Completed
2000 McHenry County Transportation Plan: Transit Component Transit Improvement Plan McHenry County $0 $0 $0 $0 Completed
2000 Morton Grove Commuter Station Location Analysis Transit-Oriented Development Plan Village of Morton Grove $50,000 $49,500 $0 $99,500 Completed
2000 Riverdale 138th Street Station Planning Study Transit-Oriented Development Plan Village of Riverdale $9,700 $0 $38,800 $48,500 Completed
2000 Robbins Metra Station Transit-Oriented Development Study Transit-Oriented Development Plan Village of Robbins $11,400 $0 $45,600 $57,000 Completed
2000 Skokie Swift Station Location Feasibility Study Transit Improvement Plan Village of Skokie $39,912 $39,971 $80,000 $159,883 Completed
2000 University Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of University Park $0 $14,987 $59,946 $74,933 Completed
1999 Blue Island Transit-Oriented Development Transit-Oriented Development Plan City of Blue Island $22,200 $0 $0 $22,200 Completed
1999 DuPage Area Transit Plan Transit Improvement Plan DuPage Mayors and Managers Conference $150,778 $0 $126,467 $277,245 Completed
1999 Elmhurst Downtown Plan Transit-Oriented Development Plan City of Elmhurst $7,500 $0 $0 $7,500 Completed
1999 Evanston Transportation Center Planning Study Transit-Oriented Development Plan City of Evanston $69,447 $29,763 $0 $99,210 Completed
1999 Kane County Transit Opportunity Assessment Transit Improvement Plan Kane County $0 $16,736 $27,000 $43,736 Completed
1999 Lake County Route 60 and Route 22 Corridor Shuttle Study Transit Improvement Plan TMA of Lake Cook $45,000 $0 $0 $45,000 Completed
1999 Olympia Fields Town Center Development Plan Transit-Oriented Development Plan Village of Olympia Fields $37,949 $0 $0 $37,949 Completed
1999 Orland Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Village of Orland Park $30,000 $20,000 $0 $50,000 Completed
1999 Waukegan Intermodal Transit Facility Study Transit-Oriented Development Plan City of Waukegan $15,000 $40,000 $60,000 $115,000 Completed
1999 Westmont Transit-Oriented Development Opportunity Study Transit-Oriented Development Plan Village of Westmont $20,000 $0 $20,000 $40,000 Completed
1998 Northwest Corridor Study Transit Improvement Plan Northwest Municipal Conference $346,487 $298,974 $484,000 $1,129,461 Completed
1998 Tinley Park Station Area Plans Transit-Oriented Development Plan Village of Tinley Park $40,000 $0 $0 $40,000 Completed
StatusNumber of Projects
Completed106
In Progress12
Programmed8
Total126
Funding SourceTotalPercent
RTA$8,506,577 47.7%
Local$4,217,427 23.6%
Federal$5,126,791 28.7%
Total$17,850,794100%