Search Criteria: Jurisdiction: Cook County, Programs: Community Planning, Intelligent Transportation Systems, Regional Transit Coordination Plan, Job Access Reverse Commute / New Freedom / Section 5310, Innovation, Coordination, and Enhancement, Access to Transit Improvement Program

NOTE: Funding is not available for Intelligent Transportation Systems and Regional Transit Coordination Plan projects.

Projects By Status
StatusNumber of Projects
Completed / Implemented142
In Progress / In Development18
Programmed13
Total173

Click on a column header to sort the table by that column.

Year Project Title Program Project Types Grantee Funding Source Status
RTA Local Federal Total
2019 Chicago 31st Street Little Village Corridor Study Community Planning Corridor Planning City of Chicago $64,000.00 $16,000.00 $0.00 $80,000.00 Programmed
2019 Pace I-294 Tri-State Transit Market and Facilities Assessment Community Planning Transit Improvement Plan Pace $0.00 $50,000.00 $200,000.00 $250,000.00 Programmed
2019 Park Forest, Matteson and Richton Park Transportation Alternatives Study Community Planning Pedestrian Access to Transit Village of Park Forest $1,000.00 $0.00 $0.00 $1,000.00 Programmed
2019 Riverside TOD Zoning Code Update Community Planning TOD Zoning Code Update Village of Riverside $35,000.00 $0.00 $0.00 $35,000.00 Programmed
2018 Bartlett TOD Zoning Update Community Planning TOD Zoning Code Update Village of Bartlett $18,875.23 $0.00 $0.00 $18,875.23 Completed
2018 Brookfield Developer Discussion Panel Community Planning Developer Panel Village of Brookfield $3,000.00 $0.00 $0.00 $3,000.00 Completed
2018 Brookfield Metra Station Bicycle Parking Access to Transit Improvement Program Village of Brookfield $13,857.00 $41,573.00 $221,720.00 $277,150.00 In Progress
2018 Chicago - South Shore Corridor Study Community Planning Corridor Planning City of Chicago $28,729.00 $7,302.00 $110,000.00 $146,031.00 In Progress
2018 Chicago Heights Pace Route Access Improvements Access to Transit Improvement Program City of Chicago Heights $12,492.00 $12,492.00 $99,936.00 $124,920.00 In Progress
2018 Cicero Zoning Code Update Community Planning TOD Zoning Code Update Town of Cicero $90,000.00 $10,000.00 $0.00 $100,000.00 Programmed
2018 Maywood TOD Plan Update Community Planning Transit-Oriented Development Plan Village of Maywood $11,762.00 $3,250.00 $50,000.00 $65,012.00 In Progress
2018 Melrose Park Metra Station and Pace Route Access Improvements Access to Transit Improvement Program Village of Melrose Park $18,700.00 $56,100.00 $299,200.00 $374,000.00 In Progress
2018 North Central Service Analysis and Implementation Study Community Planning Transit Improvement Plan Village of Mundelein $50,000.00 $25,000.00 $50,000.00 $125,000.00 In Progress
2018 Northlake Pace Route Access Improvements Access to Transit Improvement Program City of Northlake $11,496.00 $34,488.00 $183,936.00 $229,920.00 In Progress
2018 Robbins TOD Plan Update Community Planning Transit-Oriented Development Plan Village of Robbins $25,000.00 $0.00 $0.00 $25,000.00 In Progress
2016 Bellwood Pace Route Access Improvements Access to Transit Improvement Program Village of Bellwood $150,000.00 $0.00 $600,000.00 $750,000.00 In Progress
2016 CTA Bus Corridor Slow Zone Improvement Initiatives Community Planning Corridor Planning CTA $254,876.00 $63,719.00 $0.00 $318,595.00 Completed
2016 Chicago - Jefferson Park Station Area Master Plan Community Planning Transit-Oriented Development Plan City of Chicago $20,000.00 $25,000.00 $80,000.00 $125,000.00 Completed
2016 Chicago Ridge Metra Station and Pace Route Access Improvements Access to Transit Improvement Program Village of Chicago Ridge $199,647.00 $0.00 $798,592.00 $998,239.00 In Progress
2016 Cicero CTA Bus Stop Improvements Access to Transit Improvement Program Town of Cicero $51,320.00 $0.00 $205,280.00 $256,600.00 In Progress
2016 Des Plaines TOD Developer Discussion Panel Community Planning Developer Panel City of Des Plaines $3,000.00 $0.00 $0.00 $3,000.00 Completed
2016 Evanston Main Street Station Bicycle Parking Access to Transit Improvement Program City of Evanston $14,000.00 $0.00 $56,000.00 $70,000.00 Completed
2016 Midlothian Metra Station Access Improvements Access to Transit Improvement Program Village of Midlothian $196,000.00 $0.00 $784,000.00 $980,000.00 In Progress
2016 Morton Grove Developer Discussion Panel Community Planning Developer Panel Village of Morton Grove $3,000.00 $0.00 $0.00 $3,000.00 Completed
2016 Morton Grove TOD Zoning Update Community Planning TOD Zoning Code Update Village of Morton Grove $25,000.00 $0.00 $0.00 $25,000.00 Completed
2016 Mount Prospect Metra Station Bicycle Parking Access to Transit Improvement Program Village of Mount Prospect $33,700.00 $0.00 $134,800.00 $168,500.00 Completed
2016 Oak Forest Metra Station and Pace Route Improvements Access to Transit Improvement Program City of Oak Forest $112,977.00 $0.00 $451,910.00 $564,887.00 In Progress
2016 Olympia Fields TOD Zoning Update Community Planning TOD Zoning Code Update Village of Olympia Fields $25,000.00 $0.00 $0.00 $25,000.00 Completed
2016 Pace Central Harlem Avenue Corridor Study Community Planning Corridor Planning Pace $0.00 $39,900.00 $159,600.00 $199,500.00 Completed
2016 Richton Park Metra Station and Pace Route Access Improvements Access to Transit Improvement Program Village of Richton Park $70,401.00 $0.00 $281,602.00 $352,003.00 In Progress
2016 Skokie CTA Station Access Improvements Access to Transit Improvement Program Village of Skokie $62,952.00 $0.00 $251,808.00 $314,760.00 In Progress
2015 Bartlett Downtown / TOD Plan Community Planning Transit-Oriented Development Plan Village of Bartlett $0.00 $24,984.92 $99,939.67 $124,924.59 Completed
2015 Brookfield TOD Zoning Update Community Planning TOD Zoning Code Update Village of Brookfield $4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015 Evanston TOD Parking Regulations Update Community Planning TOD Zoning Code Update City of Evanston $5,000.00 $0.00 $20,000.00 $25,000.00 Completed
2015 Forest Park TOD Zoning Code Update (Roosevelt & Harlem) Community Planning TOD Zoning Code Update Village of Forest Park $4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015 Mount Prospect Rand Road Corridor Plan Community Planning Transit Improvement Plan Village of Mount Prospect $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2015 Pace Local Transit Planning For Hoffman Estates, Waukegan and Woodridge Community Planning Transit Improvement Plan Pace Suburban Bus $0.00 $30,000.00 $120,000.00 $150,000.00 Completed
2015 Pace North Avenue Corridor Study Community Planning Corridor Planning Pace Suburban Bus $0.00 $40,000.00 $160,000.00 $200,000.00 Completed
2015 Palatine TOD Plan Community Planning Transit-Oriented Development Plan Village of Palatine $79,994.00 $19,999.00 $0.00 $99,993.00 Completed
2015 River Grove Developer Discussion Panel Community Planning Developer Panel Village of River Grove $3,000.00 $0.00 $0.00 $3,000.00 Completed
2015 Skokie Developer Discussion Panel Community Planning Developer Panel Village of Skokie $3,000.00 $0.00 $0.00 $3,000.00 Completed
2015 Worth TOD Plan Community Planning Transit-Oriented Development Plan Village of Worth $19,954.67 $14,966.00 $39,909.33 $74,830.00 Completed
2014 Bellwood Developer Discussion Panel Community Planning Developer Panel Village of Bellwood $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Forest Park Developer Discussion Panel Community Planning Developer Panel Village of Forest Park $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 La Grange Metra Station Access Improvements Access to Transit Improvement Program Village of La Grange $77,000.00 $0.00 $308,100.00 $385,100.00 Completed
2014 Lemont Developer Discussion Panel Community Planning Developer Panel Village of Lemont $3,000.00 $0.00 $0.00 $3,000.00 Completed
2014 Melrose Park Broadway Avenue Corridor Plan Community Planning Corridor Planning Village of Melrose Park $19,999.60 $79,998.40 $99,998.00 Completed
2014 Palos Heights Pace Route Access Improvements Access to Transit Improvement Program Village of Palos Heights $124,000.00 $0.00 $496,190.00 $620,190.00 Completed
2014 Park Forest TOD Pedestrian Access Plan Community Planning Pedestrian Access to Transit Village of Park Forest N/A N/A N/A N/A Completed
2014 Rolling Meadows Pace Route Access Improvements Access to Transit Improvement Program City of Rolling Meadows $243,000.00 $0.00 $973,500.00 $1,216,500.00 Completed
2014 Tinley Park Developer / Financial Advisory Panel Community Planning Developer Panel Village of Tinley Park $3,000.00 $0.00 $0.00 $3,000.00 Completed
2013-2014 CTA Rail Station Guides for CTA Customers Who are Blind or Visually Impaired Job Access Reverse Commute / New Freedom / Section 5310 Mobility Management Chicago Transit Authority $0.00 $9,825.00 $43,230.00 $53,055.00 In Progress
2013-2014 City of Chicago Taxi Wheelchair Accessible Vehicle Cost Reimbursement Program Job Access Reverse Commute / New Freedom / Section 5310 Capital City of Chicago Dept. of Business Affairs & Consumer Protection $0.00 $442,923.00 $1,771,689.00 $2,214,612.00 In Progress
2013-2014 Metra Visual Information Systems (VIS) at Non-key ADA Metra Stations Job Access Reverse Commute / New Freedom / Section 5310 Capital Metra $0.00 $75,000.00 $300,000.00 $375,000.00 Completed
2013-2014 Pace CTA Skokie Swift Willow Road Connector Job Access Reverse Commute / New Freedom / Section 5310 Operating, Mobility Management Pace $0.00 $88,248.00 $98,429.00 $186,677.00 Completed
2013-2014 Pace Call-N-Ride Job Access Reverse Commute / New Freedom / Section 5310 Operating, Mobility Management Pace $0.00 $459,783.00 $486,828.00 $946,611.00 Programmed
2013-2014 Pace I-90 Service Expansion Phase I Job Access Reverse Commute / New Freedom / Section 5310 Operating, Mobility Management Pace $0.00 $633,304.00 $670,556.00 $1,303,860.00 Completed
2013 Blue Island Developer Discussion Panel Community Planning Developer Panel City of Blue Island $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 City of Chicago Ashland-Western Bus Rapid Transit Land Use Development Plan Community Planning Transit-Oriented Development Plan, Transit Improvement Plan City of Chicago $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013 City of Chicago Metra Station Area Typology Study Community Planning Transit-Oriented Development Plan City of Chicago $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2013 Franklin Park Zoning Code Update Community Planning TOD Zoning Code Update Village of Franklin Park $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013 Hanover Park Developer Discussion Panel Community Planning Developer Panel Village of Hanover Park $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Northbrook TOD Zoning Code Update Community Planning TOD Zoning Code Update Village of Northbrook $4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013 Oak Forest Developer Discussion Panel Community Planning Developer Panel City of Oak Forest $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Park Forest Developer Discussion Panel Community Planning Developer Panel Village of Park Forest $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Richton Park Developer Discussion Panel Community Planning Developer Panel Village of Richton Park $3,750.00 $0.00 $0.00 $3,750.00 Completed
2013 Ridgeland Avenue Corridor Study Community Planning Corridor Planning Cook County Department of Transportation and Highways $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013 River Grove Thatcher Avenue TOD Community Planning Transit-Oriented Development Plan Village of River Grove $60,000.00 $15,000.00 $0.00 $75,000.00 Completed
2012 Bensenville Developer Discussion Panel Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Village of Bensenville $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Cicero Connections Initiative Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Town of Cicero $118,503.20 $29,625.80 $0.00 $148,129.00 Completed
2012 Evanston Main Street Station Transit-Oriented Development Plan Community Planning Transit-Oriented Development Plan City of Evanston $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2012 Franklin Park Developer Discussion Panel Community Planning Developer Panel Village of Franklin Park $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Kenilworth Corridor Transportation and Streetscape Plan Community Planning Transit Improvement Plan Village of Kenilworth $59,999.20 $14,999.80 $0.00 $74,999.00 Completed
2012 La Grange Stone Avenue Station Access Improvement Plan Community Planning Pedestrian Access to Transit Village of LaGrange N/A N/A N/A N/A Completed
2012 Maywood Developer Discussion Panel Community Planning Developer Panel Village of Maywood $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Midlothian Developer Discussion Panel Community Planning Developer Panel Village of Midlothian $3,500.00 $0.00 $0.00 $3,500.00 Completed
2012 Mount Prospect Downtown Implementation Plan Community Planning Transit-Oriented Development Plan Village of Mount Prospect $78,876.00 $19,719.00 $0.00 $98,595.00 Completed
2012 Robbins Pedestrian Access Improvement Plan Community Planning Pedestrian Access to Transit Village of Robbins $11,856.60 $0.00 $47,426.40 $59,283.00 Completed
2012 Volunteer Express '12 Job Access Reverse Commute / New Freedom / Section 5310 Operating, Administration Hanover Township $0.00 $0.00 $12,969.00 $12,969.00 Completed
2012 Wilmette TOD Zoning Code Update (Parking) Community Planning TOD Zoning Code Update Village of Wilmette $2,000.00 $0.00 $8,000.00 $10,000.00 Completed
2011 Blue Island TOD Zoning Code Update Community Planning TOD Zoning Code Update City of Blue Island $21,666.00 $0.00 $0.00 $21,666.00 Completed
2011 Chicago Southland TOD Corridor Planning Study Phase II Implementation Community Planning Transit-Oriented Development Plan South Suburban Mayors and Managers Association (SSMMA) $100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2011 Cicero Avenue Corridor Plan Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Southwest Conference of Mayors $160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2011 Hanover Park Village Center Transit-Oriented Development (TOD) Community Planning Transit-Oriented Development Plan Village of Hanover Park $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2011 Hoffman Estates Flexible Transit Service Operations Community Planning Transit Improvement Plan Village of Hoffman Estates $64,000.00 $16,000.00 $0.00 $80,000.00 Completed
2011 Northbrook Downtown Station Area Plan Community Planning Transit-Oriented Development Plan Village of Northbrook $99,604.00 $24,901.00 $0.00 $124,505.00 Completed
2011 Rolling Meadows Golf Road Transit and Pedestrian Mobility Study Community Planning Transit Improvement Plan City of Rolling Meadows $71,008.00 $17,752.00 $0.00 $88,760.00 Completed
2011 Volunteer Express '11 Job Access Reverse Commute / New Freedom / Section 5310 Operating Hanover Township $0.00 $0.00 $15,454.00 $15,454.00 Completed
2010 Chicago South Lakefront Corridor Transit Study Community Planning Transit Improvement Plan City of Chicago $359,956.00 $89,989.00 $0.00 $449,945.00 Completed
2010 Chicago Washington Park 63rd Street Corridor TOD Study Community Planning Transit-Oriented Development Plan, Transit Improvement Plan City of Chicago $119,983.32 $29,995.83 $0.00 $149,979.15 Completed
2010 Concrete Waiting Areas at Bus Stops Job Access Reverse Commute / New Freedom / Section 5310 Capital Pace $0.00 $0.00 $600,000.00 $600,000.00 Completed
2010 Hanover Park - County Farm Road Transit Service Study Community Planning Transit Improvement Plan Village of Hanover Park $120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2010 Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid Transit Community Planning Transit Improvement Plan Pace $94,641.60 $23,660.40 $0.00 $118,302.00 Completed
2010 Ride to Work Program Job Access Reverse Commute / New Freedom / Section 5310 Operating Safer Foundation $0.00 $11,000.00 $11,000.00 $22,000.00 Completed
2010 Skokie-Dempster Station Area Plan Community Planning Transit-Oriented Development Plan Village of Skokie $99,768.20 $24,942.05 $0.00 $124,710.25 Completed
2009 #1 Indiana/Hyde Park Service Expansion Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $260,000.00 $260,000.00 $520,000.00 Programmed
2009 #44 Wallace/Racine Bus Route Extension and Service Expansion Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $459,769.00 $459,769.00 $919,538.00 Programmed
2009 #54A North Cicero/Skokie Boulevard - Midday Service Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $130,908.00 $130,908.00 $261,816.00 Programmed
2009 #67 67th/69th/71st Street - Bus Route Extension Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $160,372.00 $160,372.00 $320,744.00 Completed
2009 #92 Foster - Late Night Weekend Service Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $121,500.00 $121,500.00 $243,000.00 Programmed
2009 31st Street - New Bus Route Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $1,067,659.00 $1,067,659.00 $2,135,318.00 Programmed
2009 Automatic Bay Reading System (ABRS) for Bus Garages Innovation, Coordination, and Enhancement Capital CTA $1,280,000.00 $320,000.00 $0.00 $1,600,000.00 Completed
2009 Bensenville Transit Improvement Plan and Station Area Study Community Planning Transit-Oriented Development Plan Village of Bensenville $98,504.00 $24,626.00 $0.00 $123,130.00 Completed
2009 Bike-Transit Integration at Chicago CTA and Metra Stations Innovation, Coordination, and Enhancement Capital CDOT $188,702.00 $47,176.00 $0.00 $235,878.00 Completed
2009 Chicago - Metra Milwaukee District West Line Transit-Friendly Development Plan Community Planning Transit-Oriented Development Plan City of Chicago $175,698.00 $43,924.00 $0.00 $219,622.00 Completed
2009 Chicago Southland Transit Region Community Planning Transit-Oriented Development Plan South Suburban Mayors and Managers Association $140,000.00 $35,000.00 $0.00 $175,000.00 Completed
2009 Des Plaines Cumberland Transit-Oriented Development Plan Community Planning Transit-Oriented Development Plan City of Des Plaines $83,550.34 $0.00 $41,151.66 $124,702.00 Completed
2009 Dispatching with Mobile Computers and In-Vehicle Technology Innovation, Coordination, and Enhancement Capital Rich Township $139,694.00 $44,000.00 $0.00 $183,694.00 Completed
2009 East 83rd Street - New Bus Route Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $1,272,135.00 $1,272,135.00 $2,544,270.00 Programmed
2009 Glenwood Station Area Study Community Planning Transit-Oriented Development Plan Village of Glenwood $73,400.00 $18,350.00 $0.00 $91,750.00 Completed
2009 I-355 Corridor Development Project Innovation, Coordination, and Enhancement Operating Pace $53,995.00 $53,995.00 $0.00 $107,990.00 Completed
2009 I-55 Corridor Enhancement Project Innovation, Coordination, and Enhancement Operating Pace $226,600.00 $226,600.00 $0.00 $453,200.00 Completed
2009 Pace Harlem Avenue Corridor Plan Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Southwest Conference of Mayors $157,723.89 $39,430.97 $0.00 $197,154.86 Completed
2009 Pace I-355 Express Bus Community Planning Transit Improvement Plan Pace $212,787.20 $53,196.80 $0.00 $265,984.00 Completed
2009 Real-Time Arrival Information for Bus Stop Signs Innovation, Coordination, and Enhancement Capital CTA $5,296,973.00 $1,324,243.00 $0.00 $6,621,216.00 In Progress
2009 Schaumburg Transit Service Assessment Community Planning Transit Improvement Plan Village of Schaumburg $80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2009 Skokie Swift Oakton Street Station Area Improvement Innovation, Coordination, and Enhancement Capital Village of Skokie $1,297,389.00 $324,347.00 $0.00 $1,621,736.00 Completed
2009 Southwest Service Saturday Service Innovation, Coordination, and Enhancement Operating Metra $332,206.00 $332,206.00 $0.00 $664,412.00 Completed
2009 Western Springs Downtown Plan Community Planning Transit-Oriented Development Plan Village of Western Springs $95,984.00 $23,996.00 $0.00 $119,980.00 Completed
2009 Wilmette Village Center Master Plan Community Planning Transit-Oriented Development Plan Village of Wilmette $99,302.40 $24,825.60 $0.00 $124,128.00 Completed
2008 #18 16th/18th - Midday Service Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $464,051.00 $464,051.00 $928,102.00 Completed
2008 #53A South Pulaski Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $255,307.00 $255,307.00 $510,614.00 Completed
2008 New Clybourn Street Fixed Route Service Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $2,179,843.00 $2,179,843.00 $4,359,686.00 Programmed
2008 Regional Call Center Job Access Reverse Commute / New Freedom / Section 5310 Mobility Management Pace $0.00 $3,409,112.00 $13,676,831.00 $17,085,943.00 Completed
2007 #65 Grand Avenue & #7 Harrison Job Access Reverse Commute / New Freedom / Section 5310 Operating CTA $0.00 $886,000.00 $886,000.00 $1,772,000.00 Completed
2007 Chicago Heights Station Area Plan Community Planning Transit-Oriented Development Plan City of Chicago Heights $0.00 $19,915.00 $79,660.00 $99,575.00 Completed
2007 Chicago Transit-Friendly Development at CTA Stations Community Planning Transit-Oriented Development Plan City of Chicago $200,000.00 $50,000.00 $0.00 $250,000.00 Completed
2007 Evanston Multi-Modal Master Transportation Plan Community Planning Transit Improvement Plan City of Evanston $0.00 $80,000.00 $20,000.00 $100,000.00 Completed
2007 Greater Roseland (Chicago) Transit-Linked Community Development Project Community Planning Transit Improvement Plan Developing Communities Project (DCP) $30,000.00 $0.00 $120,000.00 $150,000.00 Completed
2007 Lake County Inter/Intra County Paratransit Transportation Study Community Planning Transit Improvement Plan Lake County $0.00 $19,322.00 $77,289.00 $96,611.00 Completed
2007 Metra Sunrise Express Job Access Reverse Commute / New Freedom / Section 5310 Operating Metra $0.00 $429,000.00 $429,000.00 $858,000.00 Completed
2007 Mount Prospect Public Transportation System Plan Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Village of Mount Prospect $0.00 $24,959.00 $99,836.00 $124,795.00 Completed
2007 Route 895 - 95th Street Rosemont/Schaumburg Express (Formerly Route 889-South Suburban Bus Express Bus Network) Job Access Reverse Commute / New Freedom / Section 5310 Operating Pace $0.00 $1,050,000.00 $1,050,000.00 $2,100,000.00 Completed
2007 South Chicago Heights Station Area Plan Community Planning Transit-Oriented Development Plan Village of South Chicago Heights $0.00 $19,931.00 $79,724.00 $99,655.00 Completed
2006 Berwyn Transit-Oriented Master Plan Community Planning Transit-Oriented Development Plan City of Berwyn $19,078.00 $0.00 $76,313.00 $95,391.00 Completed
2006 Chicago--Reconnecting Neighborhoods Community Planning Transit-Oriented Development Plan, Transit Improvement Plan City of Chicago $51,243.00 $53,446.00 $118,757.00 $223,446.00 Completed
2006 South Suburban Commuter Rail Corridor Phase I & II Community Planning Transit Improvement Plan South Suburban Mayors and Managers Association $76,811.00 $241,300.00 $0.00 $318,111.00 Completed
2005 Bellwood Transit Oriented-Development Plan Community Planning Transit-Oriented Development Plan Village of Bellwood $0.00 $20,771.00 $83,084.00 $103,855.00 Completed
2005 Elmwood Park Station Area Plan Community Planning Transit-Oriented Development Plan Village of Elmwood Park $0.00 $19,023.00 $76,094.00 $95,117.00 Completed
2005 Justice Transit Improvement Study Community Planning Transit Improvement Plan Village of Justice $6,741.00 $6,741.00 $53,928.00 $67,410.00 Completed
2005 Melrose Park Lake Street Transit Improvement Plan Community Planning Transit Improvement Plan Village of Melrose Park $0.00 $15,770.00 $63,080.00 $78,850.00 Completed
2005 Orland Park LaGrange Road Transit Improvement Plan Community Planning Transit Improvement Plan Village of Orland Park $0.00 $19,971.00 $79,884.00 $99,855.00 Completed
2004 DuPage Phase I Community Circulators Community Planning Transit Improvement Plan DuPage Mayors & Managers $140,151.00 $30,000.00 $0.00 $170,151.00 Completed
2004 Harvey Intermodal Station Area Plan Community Planning Transit-Oriented Development Plan City of Harvey $16,739.00 $0.00 $66,954.00 $83,693.00 Completed
2004 Midlothian Station Area Enhancement Community Planning Transit-Oriented Development Plan Village of Midlothian $60,000.00 $0.00 $80,000.00 $140,000.00 Completed
2004 Niles Bus Oriented-Development Plan for Milwaukee Avenue Community Planning Transit-Oriented Development Plan, Transit Improvement Plan Village of Niles $10,000.00 $10,000.00 $80,000.00 $100,000.00 Completed
2004 Park Forest Metra Electric District 211th Street Station Area Plan Community Planning Transit-Oriented Development Plan Village of Park Forest $10,200.00 $9,800.00 $80,000.00 $100,000.00 Completed
2004 Skokie and Evanston: Skokie Swift Corridor Travel Market Analysis Community Planning Transit Improvement Plan Evanston/Skokie $120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2003 Cook-DuPage Corridor Study Community Planning Transit Improvement Plan RTA $1,039,789.00 $0.00 $578,211.00 $1,618,000.00 Completed
2003 La Grange Comprehensive Plan Update and BNSF Corridor Plan Community Planning Transit-Oriented Development Plan Village of LaGrange $0.00 $65,000.00 $60,000.00 $125,000.00 Completed
2003 Oak Park Intermodal Station Area Plan Community Planning Transit-Oriented Development Plan Village of Oak Park $0.00 $181,518.00 $60,000.00 $241,518.00 Completed
2003 Pace Market Feasibility Study for North Central Shuttle Service Community Planning Transit Improvement Plan Pace $15,083.00 $0.00 $60,334.00 $75,417.00 Completed
2003 Riverside Central Business District Station Area Plan Community Planning Transit-Oriented Development Plan Village of Riverside $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2002 Franklin Park West Line Station Area Planning Study Community Planning Transit-Oriented Development Plan Village of Franklin Park $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2002 Lemont Station Area Planning Study Community Planning Transit-Oriented Development Plan Village of Lemont $0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2002 Richton Park Station Area Planning Study Community Planning Transit-Oriented Development Plan Village of Richton Park $10,042.00 $7,500.00 $70,168.00 $87,710.00 Completed
2002 Wheeling Station Area Planning Study Community Planning Transit-Oriented Development Plan Village of Wheeling $0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2001 Lake County 2020 Transportation Plan: Transit Component Community Planning Transit Improvement Plan Lake County N/A N/A N/A N/A Completed
2001 Maywood Station Area Planning Study Community Planning Transit-Oriented Development Plan Village of Maywood $17,620.00 $0.00 $70,748.00 $88,368.00 Completed
2000 Hazel Crest 170th Street Station Transit-Oriented Development Planning Study Community Planning Transit-Oriented Development Plan Village of Hazel Crest $11,000.00 $0.00 $44,000.00 $55,000.00 Completed
2000 Inner and Outer Circumferential Rail Corridors Feasibility Study Community Planning Transit Improvement Plan Metra $30,755.00 $51,464.00 $106,502.00 $188,721.00 Completed
2000 Morton Grove Commuter Station Location Analysis Community Planning Transit-Oriented Development Plan Village of Morton Grove $50,000.00 $49,500.00 $0.00 $99,500.00 Completed
2000 Riverdale 138th Street Station Planning Study Community Planning Transit-Oriented Development Plan Village of Riverdale $9,700.00 $0.00 $38,800.00 $48,500.00 Completed
2000 Robbins Metra Station Transit-Oriented Development Study Community Planning Transit-Oriented Development Plan Village of Robbins $11,400.00 $0.00 $45,600.00 $57,000.00 Completed
2000 Skokie Swift Station Location Feasibility Study Community Planning Transit Improvement Plan Village of Skokie $39,912.00 $39,971.00 $80,000.00 $159,883.00 Completed
1999 Blue Island Transit-Oriented Development Community Planning Transit-Oriented Development Plan City of Blue Island $22,200.00 $0.00 $0.00 $22,200.00 Completed
1999 Evanston Transportation Center Planning Study Community Planning Transit-Oriented Development Plan City of Evanston $69,447.00 $29,763.00 $0.00 $99,210.00 Completed
1999 Olympia Fields Town Center Development Plan Community Planning Transit-Oriented Development Plan Village of Olympia Fields $37,949.00 $0.00 $0.00 $37,949.00 Completed
1999 Orland Park Transit-Oriented Development Planning Study Community Planning Transit-Oriented Development Plan Village of Orland Park $30,000.00 $20,000.00 $0.00 $50,000.00 Completed
1998 Northwest Corridor Study Community Planning Transit Improvement Plan Northwest Municipal Conference $346,487.00 $298,974.00 $484,000.00 $1,129,461.00 Completed
1998 Tinley Park Station Area Plans Community Planning Transit-Oriented Development Plan Village of Tinley Park $40,000.00 $0.00 $0.00 $40,000.00 Completed
Pace Transit Signal Priority Demonstration for the Harvey Transportation Center Intelligent Transportation Systems N/A N/A N/A N/A Completed
Western Avenue Transit Signal Priority Feasibility Study Intelligent Transportation Systems N/A N/A N/A N/A Completed

Site Map | Feedback | About RTAMS | Data and Updates | Terms and Conditions | Glossary | Log In